Home \ News \ Extra Articles

Extra Articles

Steel Detailing

We are dedicated to offer the world-class steel-detailing services and to generate quality shop drawings to clients who demand accuracy and precision to minimize unnecessary costs and inconveniences in their projects. We only employs the most highly advanced and latest industry-standard tools, equipments, and system software available as well as the most competent and most experienced engineers for our valued customers

DRAFTING PROCEDURES 

  1. Prepare project drawing production and delivery schedule.
  2. Receive and review engineering drawings.
  3. Verifications and clarifications.
  4. Assignment of detailers for individual responsibilities and scope.
  5. Shop drawings for preliminary in-house checking.
  6. Checked drawings returned to detailers for back-check and back-drafting.
  7. Corrected drawings to checkers for final check.
  8. Drawings (now ready for fabrication) issued to CLIENT for comments and approval.
  9. Approved drawings for fabrication and erection.

DELAY DETECTION  

  • By weekly / monthly report

DELAY RECOVERY

  • Due to Drafting office:  
  1. Increase overtime from 8 hours weekly to minimum of 19 hours.
  2. Increase staff strength.
  • Due to design revisions and insufficient information:

   Beyond our control but will try to arrange for extra Detailers and Overtime with expenses to be charged to Client.

 

DELIVERY OF DRAWINGS

  1. Presently using very reliable international courier services of "DHL International". We are also using other courier services such as "OCS, TNT, and UPS" to compare speed and reliability.
  2. Shop drawings are being sent through Client’s FTP site or by Email.  
SteelStructure2  

 

 

Past projects

  • 1/2006 - 3/2006: Black Swan Projects: Piperack Area 10, 13, 15, 21
  • 4/2006 - 7/2006: QatarGas II Development Project Shelter and Equipment Structure: 24-XH0603, 25-XH0304, 26 XH0304
  • 9/2006 - 11/2006: Saddle Back projects
  • 12/2006 - 03/2007: QatarGas 3&4 Onshore ProjectShelter and Equipment Structure: 52-XH0705, 52-XH0603
  • 05/2007 - 3/2008: LA Mission College Project
  • 05/2008 - Present: LACMA PHASEII
 

Managers of COADE Inc.(Texas USA) visit Harmony

Last week (from 9th Nov to 14th Nov, 2008) a group of engineers and managers from COADE, Inc.(Texas, USA) visited Harmony. This is one of the regular activities between the two companies since the starting of cooperation in July 2007.
Read more...
 
  • «
  •  Start 
  •  Prev 
  •  1 
  •  2 
  •  3 
  •  4 
  •  Next 
  •  End 
  • »
Page 1 of 4